VideoWorks Production was responsible for the technical concept, as well as the installation and operation of the event.
Photo A: Main Hall – triple Barco blend projection on a curved screenPhoto B: Main Hall Control Room – featuring E2 switcher, playback, recording, cameras, and PPT
ALGS – Los Angeles (2024)
VideoWorks was in charge of V1, overseeing the technical setup, as well as the installation and operation of the LED wall.
Photo A: Over 900 ROE Black Pearl 2.8mm tiles + 6 IMAG projection screens Photo B: Final result during the event.
Escapade Music Festival (2024) – Main stage
VideoWorks was responsible for the main stage, including the technical concept, installation, maintenance, and operation throughout the event.
Photo A: Main stage after setup. Photo B: Main stage during the event.
And many more... Contact us! and we will gladly tell you.